How the numbers work
Every number on the Tasks page and in automatic tasks, how it is calculated, and an example you can check against your own board.
In short
On this page you can
- Understand what the number in a column header counts.
- Know why the list can show more results than the board.
- Read the attachment count on a card, including the run’s screenshot.
- Check the Total, Passed, Failed and Success (%) of an automatic task.
How to use it
- Set your filters; every count below follows them.
- Compare the column numbers with “n results found”.
- Open an automatic task and find the Step Summary table.
- Use the worked examples to check your own numbers.
Column count and Load More#
column count = tasks of this project with this status that match the current search and filters loaded = 10 at first, +10 per Load More or scroll to the bottom Load More (n): n = column count − loaded
Example: Open has 34 tasks; you filter on Priority High and 23 remain. The header shows 23, the column shows 10 cards and Load More (13). After one more load: 20 cards and Load More (3).
Dropping a card into another column changes both counts at once, without reloading.
Results found#
Kanban : results = sum of the column counts (only the selected statuses when a status filter is set) List : results = all tasks of this project that match the search and filters
Example: Open 3, In Progress 2, Resolved 0, Closed 7: 12 results found on the board and in the list.
When the list shows more: a task whose status no column shows (its status was renamed) is counted in the list but not on the board. If the list says 14 and the board 12, two tasks have such a status. See the fix.
Counts on a card#
description icon = shown when the description is not empty comments = comments on the task (activity lines are not counted) attachments = files attached + 1 if the task has a run screenshot
Example: an automatic task with the run’s screenshot, to which a tester added a log file and an image: 1 + 2 = 3 attachments. With only the screenshot, the paper-clip icon shows without a number. Icons for 0 comments or no files are hidden.
Task numbers#
task number = the task's ID, given when it is saved, unique across all projects
never reused after a delete
Example: you create #128 in project A; a colleague creates two tasks in project B; your next task in A is #131. Gaps are normal and do not mean deleted tasks. The number is what you put in the address (?task=131) to share a task.
Step Summary of an automatic task#
Passed = steps with the result Passed or Success Failed = steps with the result Failed or Error Total = Passed + Failed (other steps, such as skipped ones, are not counted) Success (%) = round(Passed ÷ Total × 100) Duration = End − Start, shown as minutes and whole seconds no counted steps → "No step details available"
| Passed | Failed | Calculation | Shown |
|---|---|---|---|
| 12 | 1 | round(12 ÷ 13 × 100) = round(92.3) | Total 13 · 92% |
| 3 | 1 | round(3 ÷ 4 × 100) | Total 4 · 75% |
| 0 | 1 | round(0) | Total 1 · 0% |
Duration example: Start 06.11.2026 02:00:05, End 02:02:19 → 134 s → 2m 14s.
A test case that stopped after its first failure has only the steps up to that point, so Success (%) shows how far it got, not how much of the test passed overall.
Other numbers#
| Number | How it is decided |
|---|---|
| List pages | 10, 25, 50 or 100 rows; tasks sorted by last update, newest first. |
| Visible attachments | The first 4; Show all attachments shows the rest. |
| Member avatars by the search box | The first 5 users of the company in alphabetical order. |
| “used in n task(s)” when deleting a status | Tasks that still have that status name. Deletion needs n = 0. See Delete a status. |
Didn’t find your answer?Write to support with your project name and what you see on screen.
info@smartestqa.ai