# Quick Start: Progress meters

Two meters show how far a project is: the setup guide checklist and the Setup Roadmap. They measure different things.

## In short

**On this page you can**

- Read the Setup n/3 checklist in the top bar and what its colours mean.
- Understand why the setup guide is kept per browser and per project.
- See the eight steps of the Setup Roadmap on the Discover page.
- Check the formula behind each roadmap percentage, with a worked example.

**How to use it**

1. Click Setup n/3 and tick each item once you have done it.
2. Finish any one route to complete Teach your app .
3. Open the Setup Roadmap tab in Discover for progress calculated by the server.
4. A step unlocks the next one at 90%; unfinished steps show at most 99%.

## Setup guide (top bar)

The **Setup n/3** button opens a checklist of three steps: [**Connect**](https://docs.smartestqa.ai/en/quick-start-connect.html), [**Teach your app**](https://docs.smartestqa.ai/en/discover.html), [**Run & report**](https://docs.smartestqa.ai/en/quick-start-first-test.html). It is red with nothing done, amber when partly done and green when all three are done.

- You tick the items yourself. The only item ticked automatically is “Add your [start page URL](https://docs.smartestqa.ai/en/quick-start-connect.html#start-page-url)”, when you add the first one.
- Progress is kept in your browser, per project. Another browser or computer starts from 0/3.
- “Teach your app” is done when any one route is fully ticked.

## Setup Roadmap (Discover page)

The roadmap is calculated by the server from what really exists in the project, so it is the same for everyone. It has eight steps: [Connect](https://docs.smartestqa.ai/en/quick-start-connect.html), [Describe the app](https://docs.smartestqa.ai/en/discover-app-map.html#page-information), [Split into modules](https://docs.smartestqa.ai/en/discover-app-map.html#modules), [Write requirements](https://docs.smartestqa.ai/en/analyze-requirements.html), [Write test cases](https://docs.smartestqa.ai/en/analyze-test-cases.html), [Build pipelines](https://docs.smartestqa.ai/en/schedule-create.html), [Connect integrations](https://docs.smartestqa.ai/en/integrations.html), [Install autonomous agents](https://docs.smartestqa.ai/en/ai-agents-catalog.html).

**How each roadmap step’s percentage is calculated** — Unfinished steps show at most 99%

```text
Connect            web: 90% when the extension answers or pages exist; device: 90% with ≥1 host
                   100% once an AI assistant has used the MCP connection
Describe the app   40% + 60% × min(1, described pages ÷ (0.6 × pages))      done at ≥60% described
Split into modules pages assigned to a module ÷ pages
Write requirements 50% × (modules with a MAIN requirement ÷ modules) + 50% if any SUB exists
Write test cases   SUB requirements that have tests ÷ SUB requirements
Build pipelines    50% when a pipeline exists; done when one has a schedule
Integrations       mail (SMTP) 50% + 50%/3 for each of issue tracker, chat, repository
                   90% with SMTP + (tracker or chat); 100% with all four
Chain rule         a step cannot pass the previous one until that one reaches 90%
```

**Example:** 10 pages, 3 with a purpose written. 0.6 × 10 = 6 pages needed, 3 ÷ 6 = 0.5, so 40 + 60 × 0.5 = 70%. With 5 described it is 90%, which unlocks the next step. With 6 described it is done.

More detail on the Describe step is on the [Discover page](https://docs.smartestqa.ai/en/discover-numbers.html#roadmap-math).